Laserfiche WebLink
JUIN 2020 DF—RO0I—I9LM70233 <br /> 1 I 1 .A site-specific cmironmental analysis <br /> (2) \ description of specific measures to be taken to ensure compliance\\ith the requirements of <br /> Article XI."COA1P1 I ANCL AA'll 115'I A Ll'1 L F i AND RLGLI.ATIO\S.' includinE;methods of <br /> reclamation contemplated by the Lessee <br /> (3) 1 he specific information outlined in Appendix C of this Lease <br /> (b) All Exploration Plans submitted to DOI,pursuant to this -Article NII and all proposed activities <br /> contained therein shall he rep iced b\ DO[ in accordance\\ith 10 C.F.R. Part 1021,"National Environmental <br /> Polio Act Implementing Procedures." <br /> (c) 11'preparation and filing of an Exploration Plan for the entire operation is dependent upon factors <br /> \Nhich cannot or\%ill not be determined except during the progress of any exploration activities. partial plans may <br /> he submitted and approved from time to time: ho%%e\er.the lessee shall not perform exploration activities not <br /> described in an approved plan. <br /> (d) Changes may be made in the approved Exploration Plan by mutual \%ritten agreement of the <br /> Lessee and DOE Appro\al is contingent upon the Lessee notrfl,in<g,all other appropriate agencies(as outlined in <br /> Appendix C)of the proposed changes. <br /> (el All costs associated ),\ith the Exploration Plan, including any approvals or permits.shall be borne <br /> solely by the Lessee. <br /> \III. MINING PLAN. <br /> (a) Prior to constructing any surface installation or commencing mine development on the Property. <br /> the Lessee shall file\�ith DOF.three(3)copies of it plan for the proposed mining operations and shall obtain <br /> DOL's approval of such plan(the"Mining Plan'*). SUC11 mining plan ;hall be consistent\\ith the"Reclamation <br /> Permit Application"(hereinafter"Application")to he filed with the Colorado%ILRB in accordance\\ith Rule I.4 <br /> and Rule G of the"Mineral Rules and Regulations"of the(olorado MLRB, as these rules may be amended, and <br /> any other applicable la\Ns or regulations.The Mining Plan shall include all information required by the Application <br /> and, in addition, must spccificaily include the tollowimo information: <br /> t I) A site-specific environmental analysis(in support of an em ironntental assessment.at a <br /> minimum) <br /> 6 <br />