Laserfiche WebLink
4.05.12 PROTECTION OF GROUND WATER RECHARGE CAPACITY <br />The reclamation plan as described in Section 2.05.4, Reclamation Plan, will return any areas where surface disturbance has <br />occurred to approximately the pre-disturbance condition; therefore, ground water recharge capacity is expected to be <br />approximately the same as the pre- disturbance condition. Also, because of the minimal usage of <br />Permit Renewal No. 4 4.01-5.1 Revised 3/5/03 <br />