My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-22_PERMIT FILE - C1981012A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2020-10-22_PERMIT FILE - C1981012A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2021 11:17:55 AM
Creation date
1/7/2021 9:00:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
10/22/2020
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
112 <br />recovery) mining, is shown on Map 3-2011, Mine Plan. A barrier pillar will <br />protect the gas wells. A corridor in which no retreat mining will occur will <br />protect gas and water pipelines associated with the gas wells. At the extents of <br />each of the panels, a bleeder entry is left in place to maintain the ventilation <br />system. Pillars will not be recovered in the bleeder entry. <br />Structures (and their owners) to be undermined by room and pillar <br />development methods only are listed below. Detail numbers are drawn <br />from Map 20; Sheet 1 -New Elk Mine Structure Inventory Map. Exhibit <br />42 includes a table of all of the structures in the permit boundary. <br />o Alluvial valley floor <br />o Highway 12 <br />o Purgatoire River <br />o Irrigated pasture land (Vigil) <br />o Detail 1 -Pipelines and roads to 35-13 New Elk (XTO Energy) <br />o Detail 3 -Pipelines and roads to 35-16 New Elk (XTO Energy) <br />o Detail 4 -Pipelines and roads to 36-13 Apache Canyon (XTO Energy) <br />o Detail 5 -Pipelines and roads to 1-3 Apache Canyon (XTO Energy) <br />o Detail 6 --Pipelines and roads to 36-15 Apache Canyon (XTO Energy) <br />o Detail 7 -Pipelines and roads to 36-16 Apache Canyon (XTO Energy) <br />o Detail 8 -Pipelines and roads to 35-11 New Elk (XTO Energy) <br />o Detail 9 -Pipelines and roads to 35-09 New Elk (XTO Energy) <br />o Detail 10 -Pipelines and roads to 36-11 New Elk (XTO Energy) <br />o Detail 11 -Pipelines and roads to 36-10 New Elk (XTO Energy) <br />o Detail 12 -Pipelines and roads to 36-5 New Elk (XTO Energy) <br />o Detail 13 -Pipelines and roads to 36-7 New Elk (XTO Energy) <br />o Detail 14 -Pipelines and roads to 35-02 New Elk (XTO Energy) <br />o Detail 15 -Pipelines and roads to 35-01 New Elk (XTO Energy) <br />o Detail I 6 -Pipelines and roads to 36-1 New Elk (XTO Energy) <br />o Detail I 7 -Pipelines and roads to 25-14 New Elk (XTO Energy) <br />o Detail 18 -Pipelines and roads to 25-16 New Elk (XTO Energy) <br />o Detail 19 -Pipelines and roads to 26-09 New Elk (XTO Energy) <br />o Detail 20 -Pipelines and roads to 25-10-2 (XTO Energy) <br />o Detail 21 -Pipelines and roads to 25-06 New Elk (XTO Energy) <br />o Detail 22 -Pipelines and roads to 25-08 New Elk (XTO Energy) <br />o Detail 23 -Pipelines and roads to 25-04 New Elk (XTO Energy) <br />o Detail 24 -Pipelines and roads to 25-02 New Elk (XTO Energy) <br />o Detail 25 -Pipelines and roads to 25-08 New Elk (XTO Energy) <br />o Detail 26 -Pipelines and roads to 24-12 New Elk (XTO Energy) <br />o Detail 27 -Pipelines and roads to 24-15 New Elk (XTO Energy) <br />o Detail 28 -Pipelines and roads to 24-16 New Elk (XTO Energy) <br />o Detail 30 -Pipelines and roads to 36-3 New Elk (XTO Energy) <br />o Detail 44 -Frame house, shed (Vialpando) <br />o Detail 45 -Frame house garage, greenhouse, hay bam, hand -dug water well <br />(Vialpando) <br />Section 2.05 RN -6 Repaginated 10/21/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.