19. Question 4-Per Rule 6.3.4(1)(c)(i)-Give the anticipated range of topsoil application to be reapplied <br /> during reclamation. Material type is noted as rock/soil mixture.Alternatively provide the estimate <br /> number of cubic yards to be handled at each project area. <br /> Project Area Ridgetop Connector <br /> anticipated topsoil to be 1-2 inches if needed <br /> reapplied 3-5 inches <br /> estimated cubic yards to be Waste Rock= 225 cubic yards Waste Rock= 125 cubic yards* <br /> handled Waste Soil =220 cubic yards Soil =75 cubic yards* <br /> Topsoil = 205 cubic yards <br /> * =Connector Project Area is a reclamation Project ONLY. The material will be moved ONCE to its <br /> permanent location then contoured and reseeded. This material should not be accounted for, as it <br /> can stay until moved. If we do nothing, there is nothing to reclaim! <br /> 20. Question 6-Per Rule 6.3.4(1)(c)(iv)-Once see is hand applied will it be raked into the soil. <br /> The ground will be hand-ripped, mulch and seed applied then hand ripped again to half the <br /> depth of the previous ripping to allow mixing of the soil, mulch, and seed. <br /> 21. Question 9-Per Rule 6.3.4(1)(c)(v)-State the application method used for spreading straw mulch <br /> and clarify if it will be crimped/tacked down in any way. <br /> The ground will be hand-ripped, mulch and seed applied then hand ripped again to half the <br /> depth of the previous ripping to allow mixing of the soil, mulch, and seed. <br /> 22. Per Rule 6.3.4(1)(c)(ii) - Will trails/roads be decompacted prior to reclamation? <br /> Yes—in the above prescribed fashion except for the historic access road between the claim <br /> boundaries and BLM -297 route. <br />