Laserfiche WebLink
Exhibit C <br /> Z Pursuant to Rule 6.3.3(1)(i), Will ground water be encountered at any of the project areas? <br /> NO. <br /> 8. During a previous inspection the use of Dexpan or Eco-Blast as an alternative to conventional <br /> explosives was mentioned. Moving forward with the project will either of these materials be used? <br /> At this point, NO—We feel this will disrupt the stability of the bedrock. If this changes, Miners <br /> Mall will submit a technical change before proceeding. <br /> 9. What disturbances will the support areas include?A flat pad being erected? <br /> A flat area will be created. Job boxes will be secured to existing trees within the support area or <br /> directly adjacent the support area. These boxes include tools and first aid gear. <br /> 10. Will any ventilation shafts or additional portals/adits beyond what is historically present be <br /> constructed? <br /> Yes—a NEW portal will be constructed at the Ridgetop Project Area over the OLD vertical shaft, <br /> which is BELOW the reclamation level. <br />