Laserfiche WebLink
Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 11/17/2020 <br /> Contractor: Ensero Solutions <br /> Shift <br /> Hours Worked Weather: <br /> From: To: <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Sam Lowe ) 1 0.25 Kessler Reclamation 4 3 <br /> Contractor Equipment No. TotHours Subcontractor Equipment No. TotHours <br /> Passenger truck 0 0 Skidsteer 1 1 <br /> ............ <br /> Description of Work Performed: <br /> Complete berm and minor grading on top of NWRP. <br /> Spread and rake in seed to disturbed areas. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences,etc.) <br /> Inspector: Sam Lowe Date: 11/17/2020 <br />