Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 11/3/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: <br /> From: 11:00 To: 13:00 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. <br /> Hours (by Labor Class) No. <br /> Hours <br /> Oversight (Sam) 1 2 Kessler Reclamation 5 10 <br /> Contractor Equipment No. Totl Hours Subcontractor Equipment No. TotHours <br /> Passenger truck 1 1 Excavator 1 8 <br /> Grizzly 1 8 <br /> Loader 1 8 <br /> Haul Truck 1 8 <br /> Description of Work Performed: <br /> Screening material at the 00 for backfilling along channel alignment continues. <br /> Backfilling the sides of the channel completed. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences, etc.) <br /> Schedule: Finish access road by today or tomorrow (Wed.). Grading of the riprap basin on Wednesday. <br /> Gravel bedding to be delivered Wednesday. <br /> Friday: all materials for 6" low-flow crossing to be on site <br /> Inspector: Sam Lowe Date: 11/3/2020 <br />