Laserfiche WebLink
Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 10/9/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Clear sky, no wind, 80 degrees <br /> From: 12:00 To: 13:30 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Evan Valencia) 1 1.5 Kessler Reclamation 5 5 <br /> H&H Lining 3 10 <br /> Joe Kaul 1 7 <br /> Contractor Equipment No. Total Subcontractor Equipment No. Total <br /> Hours Hours <br /> Passenger truck 1 1 Small Excavator 1 5 <br /> Description of Work Performed: <br /> H&H finished all work for the liner.The geotextile was bolted to the headwall. <br /> Kessler's continued backfilling the key trenches. <br /> Billy Ray, Allen Steckelberg, and Paul Newman were on site for oversight. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences, etc.) <br /> Inspector: Evan Valencia Date: 10/9/2020 <br />