Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 10/5/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Clear sky, no wind, 65 degrees <br /> From: 12:00 To: 13:30 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Evan Valencia) 1 1.5 Kessler Reclamation 5 10 <br /> Contractor Equipment No. Total Subcontractor Equipment No. Total <br /> Hours Hours <br /> Passenger truck 1 1 Excavator 1 10 <br /> Loader 1 10 <br /> Small excavator 1 10 <br /> Haul Truck 1 10 <br /> Description of Work Performed: <br /> Excavation of the open conveyance was completed today. A custom bucket was created by Kessler to dig <br /> the channel to design criteria. A small excavator was used to dig the two channels outside of the main ditc <br /> for keying in the liner material. Kessler measured the dimensions of the channel as excavation progressed <br /> to ensure the correct size and shape.The road was finished as well. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences, etc.) <br /> H&H was on site today to start their work. Elizabeth Busby gave their team an introduction to the site. <br /> Materials are being prepared for the installation of the liner tomorrow. <br /> Inspector: Evan Valencia Date: 10/5/2020 <br />