Laserfiche WebLink
Colorado Legacy Land Former Schwartzwalder Mine <br /> North Waste Rock Pile Diversion Channel <br /> Contractor's approval shall constitute a representation to Owner and Engineer <br /> that Contractor approves the submittals and has determined and verified all <br /> quantities, dimensions, field construction and installation criteria,materials, <br /> catalog numbers,compliance with Laws and Regulations, and similar data. <br /> Contractor assumes full responsibility for doing so; and Contractor has <br /> coordinated each submittal with the requirements of the Work and the Contract <br /> Documents. <br /> 5. At the time of each submission,call to the attention of Engineer in the letter of <br /> transmittal any deviations from requirements of the Contract Documents. <br /> 6. Make all modifications noted or indicated by Engineer and return the revised <br /> submittals until approved. Direct specific attention in writing,or on revised <br /> submittals,to changes other than the modifications called for by Engineer on <br /> previous submittals. After paper copy submittals have been approved, submit <br /> copies thereof for final distribution. Previously approved submittals transmitted <br /> for final distribution will not be further reviewed and are not to be revised. If <br /> errors are discovered during manufacture or fabrication, convect the submittal and <br /> resubmit for review. <br /> 7. Following completion of the Work and prior to final payment, furnish record <br /> documents and approved Shop Drawings necessary to indicate "as constructed" <br /> conditions, including field modifications, in the number of copies specified. All <br /> such copies shall be clearly marked"PROJECT RECORD." <br /> 8. Keep a copy or sample of each Submittal in good order at the Site. <br /> D. Quantity Requirements: <br /> 1. Except as otherwise specified,transmit all Shop Drawings in either of the <br /> following quantities: <br /> a. Initial Submittal: <br /> i. Electronic-One copy to Engineer. <br /> b. Resubmittals: <br /> i. Electronic-One copy to Engineer. <br /> C. As-constructed documents: <br /> i. Electronic-One copy to Engineer. <br /> 2. Transmit submittals of product data as follows: <br /> a. Initial Submittal: <br /> i. Electronic-One copy to Engineer. <br /> b. Resubmittals: <br /> Section 013300- Submittals Page 4 <br />