My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-28_GENERAL DOCUMENTS - M1977300 (23)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977300
>
2020-12-28_GENERAL DOCUMENTS - M1977300 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 6:32:51 AM
Creation date
12/30/2020 6:05:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
General Documents
Doc Date
12/28/2020
Doc Name Note
Part 3 of 3
Doc Name
North Waste Rock Pile Diversion
From
Colorado Legacy Land
To
DRMS
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OAGW <br /> Fill Testing Client: Project: <br /> Report#:FT-000003 Alexco Water and Environmental 201007 <br /> Report Date:10/23/2020 131 East Lincoln Avenue TR-28 North Waste <br /> Field Services Test Method:ASTM D 6938 Suite 200 Rock Pile Diversion Channel(Schwartzwalder <br /> 2180 South Ivanhoe Street,Suite 5 Fort Collins,CO 80524 M... <br /> Denver,Co 80222 Golden,CO <br /> Phone:(303)759-8100 <br /> Test Results <br /> In Place In Place Optimum <br /> Optimum Maximum In Place Dry Wet Probe Moisture <br /> Retest Test Soil Moisture Dry Density Moisture Density Density Depth Percent Min Comp. Tolerance <br /> Test# Of Date Proctor ID Method Classification M) (pcf) (%) (pcf) (pcf) (in) Compaction (%) (%) Remark <br /> 21 9/28/20 02 ASTM A-1-b 5.7 144.3 6.6 136.7 145.7 8 95 95 -3/3 Pass <br /> D1557 <br /> 22 9/28/20 02 ASTM A-1-b 5.7 144.3 10.8 129.9 143.9 8 90 95 -3/3 Fail <br /> D1557 <br /> 23 22 9/28/20 02 ASTM A-1-b 5.7 144.3 5.7 137.4 145.2 8 95 95 -3/3 Pass <br /> D1557 <br /> 24 9/28/20 02 ASTM A-1-b 5.7 144.3 5.2 137.7 144.9 8 95 95 -3/3 Pass <br /> D1557 <br /> 25 9/28/20 02 ASTM A-1-b 5.7 144.3 7.2 136.5 146.3 8 95 95 -3/3 Pass <br /> D1557 <br /> 26 9/28/20 02 ASTM A-1-b 5.7 144.3 5.7 136.6 144.4 8 95 95 -3/3 Pass <br /> D1557 <br /> 27 9/28/20 02 ASTM A-1-b 5.7 144.3 6.8 137.1 1 146.4 8 1 95 95 -3/3 PI <br /> D1557 <br /> Test Information <br /> Gauge <br /> Test# Test Location Elevation I Reference Make/Model/SN/Calibrated Field Technician <br /> 21 Trickle Channel:Diversion Channel,Station:5+30 3.0 AEG Troxler/3430/38192/ Platzer,Neal <br /> 22 Trickle Channel:Diversion Channel,Station:4+30 3.0 AEG Troxler/3430/38192/ Platzer,Neal <br /> 23 Trickle Channel:Diversion Channel,Station:4+30 3.0 AEG Troxler/3430/38192/ Platzer,Neal <br /> 24 Trickle Channel:Diversion Channel,Station:3+30 3.0 AEG Troxler/3430/38192/ Platzer,Neal <br /> 25 Trickle Channel:Diversion Channel,Station:2+30 3.0 AEG Troxler/3430/38192/ Platzer,Neal <br /> 26 Trickle Channel:Diversion Channel,Station:1+30 3.0 AEG Troxler/3430/38192/ Platzer,Neal <br /> 27 Trickle Channel:Diversion Channel,Station:0+30 3.0 AEG Troxler/3430/38192/ Platzer,Neal <br /> Remarks Comments <br /> Pass:Density Pass/Moisture Pass Tests are"Direct Transmission'(Method A)unless probe depth is noted as <br /> °Backscatter".Gauge calibration data on file with the testing agency. <br /> Fail:Density Fail/Moisture Fail 27:The Contractor,ENSERO utilized a loader,excavator,and <br /> sheepsfoot compactor to place,process and apply compactive effort <br /> to the subgade.Moisture was added with a water truck. <br /> AEG=Above Existina Grade. <br /> A representative of the Contractor was informed of our test results and observations.Observation services were conducted on an on-call basis.The test Page 1 of 1 <br /> depths and locations are approximate and are based upon information provided by the Contractor.The lateral and vertical extents of any subexcavation were <br /> not measured or verified by this firm.The site conditions noted and test results reported apply only to the locations and depths tested at the time of our visit. <br /> It remains the Contractor's responsibility to apply the necessary compactive effort and moisture conditioning to meet the project specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.