Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 8/26/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Sunny, smoky, 98 degrees <br /> From: 12:00 To: 15:00 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Evan Valencia) 1 3 Kessler Reclamation 6 10 <br /> Contractor Equipment No. Total Subcontractor Equipment No. Total <br /> Hours Hours <br /> Passenger truck 1 1 Excavator 1 10 <br /> Haul truck 2 10 <br /> Bull Dozer 1 10 <br /> Skid Steer 2 10 <br /> Description of Work Performed: <br /> Continue initial excavation for diversion channel. Kessler Reclamation continued to prepare diversion <br /> Channel by rough digging area to engineered depth.The excavated soil is loaded into two alternating <br /> haul trucks and either stock piled or disposed of in the open hole located in the Minnesota adit. <br /> Following the initial dig a bulldozer is used to grade and control soil for further soil loading. <br /> Skid steers are used to consolidate excavated soil underground. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences,etc.) <br /> Herc Rentals has a 2,000 gal gasoline truck available for the next month. An account needs to be created <br /> to pay and secure the reservation. <br /> Work on the NWRP will not happen tomorrow, 8/27, to organize the water truck reservation and continue <br /> excavation in valley floor. <br /> Gamma scanning of the excavation area on NWRP was conducted the morning of 8/27. <br /> Inspector: Evan Valencia Date: 8/26/2020 <br />