Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 8/20/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Sunny, smoky, 95 degrees, afternoon stor <br /> From: 13:30 To: 14:00 <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Evan) 1 0.5 Kessler Reclamation 2 10 <br /> Contractor Equipment No. TotHours Subcontractor Equipment No. TotHours <br /> Excavator 1 6.5 <br /> Haul truck 1 6.5 <br /> Presence of Water: No Description: No longer visible due to first pour of wall. <br /> Description of Work Performed <br /> Excavation continues for the ditch <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences,etc.) <br /> U-Joint broke on haul truck in morning. Calvin had to go into the city to get the part. Working continued. <br /> Kessler hopes to be done with excavating material by the end of this Friday. <br /> Inspector: Evan Valencia Date: 8/20/2020 <br />