Daily Construction Inspection Report <br /> Project: TR-28 North Waste Rock Pile Diversion Channel Date: 8/6/2020 <br /> Contractor: Ensero Solutions <br /> Shift Hours Worked Weather: Sunny, 80 degrees <br /> From: 9:00 To: 11:00am <br /> Contractor Manpower Total Subcontractor Manpower Total <br /> (by Labor Class) No. Hours (by Labor Class) No Hours <br /> Oversight (Tyler) 1 1 Kessler Reclamation 3 3 <br /> Contractor Equipment No. Totl Hours Subcontractor Equipment No. TotHours <br /> Pickup Truck 1 1 Gator 1 0.5 <br /> Honda Generator 1 1 <br /> Concrete Vibrator 1 1 <br /> Description of Work Performed <br /> Work on the headwall framing continued. <br /> Remarks by Contractor(Delays, Interruptions, Deviations, Extra Work Activities, Unusual Occurrences,etc.) <br /> Inspector: Evan Valencia Date: 8/6/2020 <br />