My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-23_GENERAL DOCUMENTS - M1977342 (5)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977342
>
2020-12-23_GENERAL DOCUMENTS - M1977342 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 9:05:53 AM
Creation date
12/23/2020 9:30:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
General Documents
Doc Date
12/23/2020
Doc Name
Inspoection Items Follow-up Memo
From
Climax Molybdenum
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Peter Hays,DRMS <br /> December 15,2020 <br /> kA <br /> r !w.�s,oc�• <br /> /r <br /> Figure 2. Repaired section near Reclaim#1. <br /> The trench was excavated farther to the east to determine from where the water was coming from, however <br /> the leak was not found along that section of the pipeline. <br /> Another section of the fire water line was then isolated and the leak was found in the four-inch diameter <br /> branch of the fire water line that supplies the pine oil room fire suppression system (Figure 3)and repaired <br /> using two compression fittings similar to the other repairs. <br /> The excavation was backfilled with crushed rock and gravel. Any paving work will be completed during the <br /> mill site paving project in 2021. <br /> Y;x <br /> S. <br /> a <br /> r <br /> 3 <br /> Figure 3. Hole found in 4-inch pipeline <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.