Laserfiche WebLink
® Climax Molybdenum COLORADO Oe des onOMs <br /> A Freeport-McMoRan Company 19302 County Road 3 <br /> Parshall, CO 80468 <br /> Phone(303)569-3221 <br /> 7 <br /> December 15, 2020 <br /> DEC 2 J Mu <br /> Via Email and UPS: 1Z8046410394639355 <br /> Mr. Peter Has p1V1S10 101=`RFCLVA710P1 <br /> Y mPiN!NG AND SAF-:T f <br /> Division of Reclamation, Mining and Safety <br /> 1313 Sherman St., Rm. 215 <br /> Denver, CO 80203 <br /> Re: Follow-up Memo to November Inspection Items - Fire Water Pipeline Repairs, Climax <br /> Molybdenum Company, Henderson Operations, Reclamation Permit No. M-1977-342 <br /> Dear Mr. Hays: <br /> Henderson is providing this written follow-up with additional information regarding the Mill fire water pipeline <br /> repairs discussed during your November site inspection. <br /> To repair the leaks in the fire water pipeline on the north side of the Mill building,the pipeline was excavated <br /> and a hole was found in the pipe just east of reclaim number 1 (Figure 1). The damaged section of pipe <br /> was removed and a new piece installed using two compression fittings (Figure 2). While this fixed that leak, <br /> more water appeared coming into the excavated trench from the east. <br /> C <br /> N _3' <br /> w,K roa ocwr. au t <br /> IK1A�IED Ow9 4-�-1q <br /> Pine Oil Room MKATM <br /> VALVE YWA= <br /> Mill Building <br /> Figure 1. General location map of the repairs <br />