Laserfiche WebLink
2005 <br />Phase II bond release request, SL-06, approved for 819.1 acres <br />2006 <br />Phase III bond release request, SL-07, approved for 762.8 acres <br />2006 <br />A major slide occurred in October 2006 at the East Panel. <br />2008 <br />Renewal RN-05 approved. <br />2008 <br />AD Adding Disturbed and Affected Acreage that was never added to <br />permit from RN3/PR4 in 5/13/1998. jrc <br />2008 <br />TR103 Mining and Reclamation Plan Updates in A, K & Z Pits; Update <br />Deal and Horse Gulch Pond Information <br />2008 <br />SL10 Phase III Bond Release For Trapper Mine Rangelands Located in <br />A, D, and H Pits of 305.0 acres. Released liability of $228,664.00. <br />2009 <br />SL8 Phase I Bond Release for Trapper Mine Land Reclaimed Between <br />2003 and 2007 of 476.6 acres. Released liability of $0.00. <br />2009 <br />SL9 Phase II Bond Release on 294.6 acres of land at the Trapper Mine. <br />Released liability of $898,333.00. <br />2009 <br />PR6 Proposed Trapper Mine Plan for 5 Year Permit Term 2007-2012. <br />Mine plan, including placement of overburden spoil material from the K <br />Pit into Horse Gulch Fill and K Pit Buttress Fill. <br />2010 <br />TR106 Revision to the Mining Sequence in K-Pit, including removal of K <br />Pit Buttress Fill from the plan. <br />2011 <br />SL11 Phase I Bond Release on 57.8 Acres. Released liability of $0.00. <br />2012 <br />SL12 Phase II Bond Release of 4 Parcels, 165.5 acres total. Released <br />liability of $0.00. <br />2012 <br />SL13 Phase III Bond Release for Trapper Mine Rangelands in A, D, and <br />F Pits. Released liability of $0.00. <br />2013 <br />TR110 Water Monitoring Sampling and Frequency Update <br />2013 <br />RN6 Permit Renewal 906 (RN-06) renew permit for five years <br />2014 <br />SL14 Phase I bond release of 417.8 acres of parcels in A, F, Z and K Pits. <br />Reduction in liability of $2,068,397.69. <br />2014 <br />SL15 Phase I bond release of 120.4 acres in A, Z and K pits . Reduction <br />in liability of $520,670.46. <br />2015 <br />SL16 Phase II bond release of 277.8 acres in the A, F, K and Z pits. <br />Reduction in liability of $376,228.82. <br />2015 <br />PR7, increase in permit area of 774.39 acres and increase in affected area <br />of 58.10 acres, updated mining and reclamation plan for 2012-2017 <br />permit term and resulted in a reduction in liability of $4,014,314.80. <br />2016 <br />TR115, POMT and Mine Plan updates, added 49.70 acres of affected land <br />and increased liability by $379,501.44. <br />2016 <br />SL17, Phase III bond release of 448.40 acres. Reduced liability by <br />$696,737.41. <br />2018 <br />RN7, renewal of the permit for another five year permit term. Reduction <br />in liability of $879,386.29. <br />MT8_Trapper Midterm 2020 Findings JLE (1) Page 4 <br />