My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-30_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2020-06-30_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 11:37:14 AM
Creation date
12/21/2020 11:30:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
6/30/2020
Doc Name Note
FOR MT8
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Permit Index Doc Type
Findings
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION II - Summary of Operations, Revisions to Permit, Violations, Stipulations, <br />Variances, and Bond <br />Operations <br />Table 2 summarizes the history of Permit C-1981-010, prior to the most recent renewal, RN- <br />07_ <br />Table 2 — Summary of history of Permit C-1981-010 <br />Date <br />Action <br />1954 - 1958 <br />State, county, and federal coal leases issued for the future Trapper Mine <br />site <br />1972 <br />Utah International, original operator of Trapper Mine, begins <br />environmental studies of the site <br />1976 <br />Colorado Mined Land Reclamation Division issues mining permit C-76- <br />11 to Utah International <br />1977 <br />Mining operations begin on the site <br />1982 <br />Permit C-81-010 issued, replacing C-76-11 <br />April 1983 <br />Utah International transfers Trapper Mine to its then wholly -owned <br />subsidiary, Trapper Mining Inc. <br />July 1983 <br />Utah International sells Trapper Mining Inc. to corporate consortium that <br />owns Craig power plant <br />1987 <br />Permit Revision PR-01 approved (changes in permit boundary, topsoil <br />stripping, overburden blasting, and pit pumpage in Colt and Browning <br />pits) <br />1988 <br />Permit Renewal RN-01/Permit Revision PR-02 approved (changes in pit <br />advancements, new pits, environmental baseline data, sediment/erosion <br />control, operations description, etc.) <br />1993 <br />Permit Renewal RN-02/Permit Revision PR-03 approved (new pits and <br />advancement of existing pits) <br />1998 <br />Permit Renewal RN-03/Permit Revision PR-04 approved (advancement <br />of pits, new pits, update of information in permit application) <br />1998 <br />Phase I and II bond release request, SL-01, approved for 2511.7 acres <br />Phase I, 1548.0 acres Phase II <br />1999 <br />Phase II bond release request, SL-02, approved for 319.5 acres <br />2000 <br />Five pits are open on the Trapper Mine; of these, three are being actively <br />mined (D, F, and A -South pits), one is being backfilled with ash from the <br />Craig power plant (Ash pit), and one is temporarily abandoned (E pit). <br />2002 <br />Phase II bond release request, SL-03, approved for 592.7 acres <br />2003 <br />Renewal RN-04/Permit Revision-05 approved (advancement of pits, re- <br />orientation of Pits G and Z. Revised post -mining topography) <br />2003 <br />Phase III bond release request, SL-04, approved for 1857.7 acres on the <br />west side of the permit area. <br />2004 <br />Phase I bond release request, SL-05, approved for 823.9 acres <br />MT8_Trapper Midterm 2020 Findings JLE (1) Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.