My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-30_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-06-30_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 11:37:14 AM
Creation date
12/21/2020 11:14:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
6/30/2020
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Type & Sequence
MT8
Permit Index Doc Type
Findings
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1— Specific Midterm Review Topics <br />Section Topic Applicability at Trapper Mine <br />2.06.2(10) <br />Experimental practices <br />Inapplicable, no such practices. <br />2.06.3(4)(a) <br />Mountaintop removal <br />Inapplicable, no such variances. <br />variances <br />Inapplicable, no such variances <br />exist at the time of this review. <br />However, TMI has requested a <br />Variances from approximate <br />variance in the approximate <br />2.06.5(3)(c) <br />original contour for steep <br />original contour requirement for a <br />slope mining <br />portion of the site with the Permit <br />Revision No. 9 (PR9) application. <br />This application and the associated <br />request for a variance is currently <br />under review by DRMS. <br />Reclamation delay at <br />2.06.7(5) <br />combined surface/subsurface <br />Inapplicable, surface mine only. <br />mines <br />3.02.2(4) <br />Adequacy of bond amount <br />Applicable. <br />and terms <br />Regarding steep slopes (Rules 2.06.4, 2.06.5, and 4.27), no specific approvals have been <br />granted to TMI for the Trapper Mine (RN-07). However, as discussed in Table 1, DRMS is <br />reviewing TMI's request for a variance for this with PR9. <br />Midterm Review Methodolo2y <br />For this Midterm Review, the Division reviewed the following documents: <br />1. Permit application; <br />2. Revisions made to the permit since the last permit renewal; <br />3. Annual reclamation and hydrology reports; <br />4. Bond surety and reclamation cost estimate; <br />5. Division findings documents and previous Midterm Reviews; <br />6. Notices of violations since last permit renewal, if any. <br />MT8_Trapper Midterm 2020 Findings ME (1) Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.