My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-06-30_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-06-30_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 11:37:14 AM
Creation date
12/21/2020 11:14:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
6/30/2020
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Type & Sequence
MT8
Permit Index Doc Type
Findings
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION I - INTRODUCTION <br />Purpose of this Document <br />This document presents the results of the Midterm Permit Review number 8 (MT8) of the <br />Trapper Mining, Inc. (TMI) Trapper Mine. The Colorado Division of Reclamation, Mining <br />and Safety (Division) conducted this review for the purpose of fulfilling the requirements of <br />the Colorado Surface Coal Mining Reclamation Act (Act), and the Regulations of the Colorado <br />Mined Land Reclamation Board for Coal Mining (Regulations). <br />Organization of this Document <br />This document is divided into the following three parts: <br />Part I - Introduction <br />Part II— Summary of Operations, Revisions to Permit, <br />Violations, Stipulations, Variances, and Bond <br />Part III — Requested Revisions of Permit Application <br />Midterm Review Requirements of the Regulations <br />Section 2.08.3 of the Regulations requires the Division to conduct a general review of each <br />mining and reclamation permit prior to the middle of the permit's term (2 '/z years). Based on <br />this Midterm Review, for good cause shown, the Division may require the permittee to revise <br />or modify the permit in order to ensure compliance with the Act and Regulations. <br />Table I lists the other Sections of the Regulations that require a Midterm Review of specific <br />aspects of each permit. <br />MT8_Trapper Midterm 2020 Findings JLE (1) Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.