My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-12_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2020-12-12_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 4:44:40 PM
Creation date
12/16/2020 4:43:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
12/12/2020
Doc Name Note
For SL22
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Permit Index Doc Type
Findings
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> Middloryeatt <br /> Y. <br /> or <br /> 0:' <br /> ------------- <br /> East Middte Flume I <br /> Middle(Hume 3 East Flume <br /> VVestVbrse <br /> I1 <br /> 5-16,ZA-14,ZA-15, KA <br /> i <br /> r <br /> PEA-'E 6 <br /> ------------ <br /> ------------------------- <br /> Map]: SL22 proposed Phase H bond release parcels are shown in light orange. . The purple circles indicate the locations of <br /> topsoil depth sampling DRMS conducted in 2017. Parcels AB16, and FA16 represent constructed drainages carved out of <br /> previous bond releases. The constructed drainage in parcel ZAB16 is integral to the parcel so,not specifically delineated. <br /> Table 2. Summary of Bond Release Parcels Table 2 lists the parcels requested in SL22, the <br /> and Associated Acres acreages associated and the permitting action <br /> Parcel Acres Phase I releasing the parcels from phase I and II liability. <br /> AB14 2.7 SL18 <br /> AB16 18.4 SL18 Public Notice <br /> FA16 3.7 SL18 TMI published notice of the bond release <br /> KA16 32.9 SL18 applications in the Craig Daily Press once weekly <br /> ZA14 2.0 SL18 for four consecutive weeks beginning on 7 August <br /> ZA15 26.9 SL18 2020. TMI also notified landowners within and <br /> ZAB 16 88.4 SL18 adjacent to the mine permit area, and other interested <br /> parties of the application for bond release,as required <br /> by section 3.03.2(1). The Division received no written comments, objections, or requests for an informal <br /> conference regarding the bond release application. <br /> Bond Release Inspection <br /> As the SL22 application was deemed complete as submitted and no adequacy questions were posed by <br /> DRMS at that time, the Division conducted a bond release inspection on 13 October 2020. The site <br /> inspection was conducted in accordance with Section 3.03.2(2). The Division notified the operator, <br /> surface owners, Bureau of Land Management (BLM), the Office of Surface Mining (OSM), and the <br /> Permit Number C1981010 <br /> SL22 Page 5 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.