My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-12_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2020-12-12_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 4:44:40 PM
Creation date
12/16/2020 4:43:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
12/12/2020
Doc Name Note
For SL22
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Permit Index Doc Type
Findings
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*I- Changed from 819.1 during review of TR-109 as per DRMS letter of 21 August 2012. <br /> *2- No change in liability occurred in SL-11,the liability amount at the time of the approval of <br /> SL-t lwas updated as a result of Midterm Review 6 (MT6). <br /> *3- As per SL-14 findings, acres had not previously been Phase III released. <br /> *4- As per SL-14 findings,Trapper redisturbed acres previously bond released. <br /> *5- As per SL-14 findings,Trapper redisturbed acres. <br /> *6- Adjustment for redisturbance as per 2014 ARR. <br /> *7- Disturbance was requested as redisturbance of bond released acres but has not yet been redisturbed. <br /> Therefore, acres remain in totals as bond released. <br /> *8—See section V of SL20 findings document for details. <br /> Submittal of Bond Release Application and Completeness Determination by the Division <br /> TMI submitted the bond release application following the procedures described in the Act and <br /> Regulations. The application also utilized the Division's Guideline Regarding Selected Coal Mine Bond <br /> Release Issues, dated April 18, 1995. <br /> The Division received TMI's Phase H bond release application SL22, on 3 September 2020, and found <br /> the application complete on 11 September 2020, after the Division received proof of publication of the <br /> applicant's public notice. The Applicant published the permitting action beginning on 7 August 2020 in <br /> the Craig Daily Press. The completeness determination was made in accordance with Section 3.03.2(l)(d). <br /> Map 1, entitled SL22 Phase II Bond Release Area Delineation and submitted with the application,shows <br /> the location of each proposed bond release parcel <br /> Bond Release Parcels <br /> SL22 requests Phase II bond release for the following seven parcels as per Table 2 and Map 1, below. <br /> Map 2 on page 8 of this document shows a close up of the main bond release block. <br /> Permit Number C1981010 <br /> SL22 Page 4 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.