My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-12_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-12-12_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 4:44:41 PM
Creation date
12/16/2020 4:36:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
12/12/2020
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Type & Sequence
SL22
Permit Index Doc Type
Findings
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> Middloryeatt <br /> Y. <br /> or <br /> 0:' <br /> ------------- <br /> East Middte Flume I <br /> Middle(Hume 3 East Flume <br /> VVestVbrse <br /> I1 <br /> 5-16,ZA-14,ZA-15, KA <br /> i <br /> r <br /> PEA-'E 6 <br /> ------------ <br /> ------------------------- <br /> Map]: SL22 proposed Phase H bond release parcels are shown in light orange. . The purple circles indicate the locations of <br /> topsoil depth sampling DRMS conducted in 2017. Parcels AB16, and FA16 represent constructed drainages carved out of <br /> previous bond releases. The constructed drainage in parcel ZAB16 is integral to the parcel so,not specifically delineated. <br /> Table 2. Summary of Bond Release Parcels Table 2 lists the parcels requested in SL22, the <br /> and Associated Acres acreages associated and the permitting action <br /> Parcel Acres Phase I releasing the parcels from phase I and II liability. <br /> AB14 2.7 SL18 <br /> AB16 18.4 SL18 Public Notice <br /> FA16 3.7 SL18 TMI published notice of the bond release <br /> KA16 32.9 SL18 applications in the Craig Daily Press once weekly <br /> ZA14 2.0 SL18 for four consecutive weeks beginning on 7 August <br /> ZA15 26.9 SL18 2020. TMI also notified landowners within and <br /> ZAB 16 88.4 SL18 adjacent to the mine permit area, and other interested <br /> parties of the application for bond release,as required <br /> by section 3.03.2(1). The Division received no written comments, objections, or requests for an informal <br /> conference regarding the bond release application. <br /> Bond Release Inspection <br /> As the SL22 application was deemed complete as submitted and no adequacy questions were posed by <br /> DRMS at that time, the Division conducted a bond release inspection on 13 October 2020. The site <br /> inspection was conducted in accordance with Section 3.03.2(2). The Division notified the operator, <br /> surface owners, Bureau of Land Management (BLM), the Office of Surface Mining (OSM), and the <br /> Permit Number C1981010 <br /> SL22 Page 5 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.