My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-12_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-12-12_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 4:44:41 PM
Creation date
12/16/2020 4:36:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
12/12/2020
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Type & Sequence
SL22
Permit Index Doc Type
Findings
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*I- Changed from 819.1 during review of TR-109 as per DRMS letter of 21 August 2012. <br /> *2- No change in liability occurred in SL-11,the liability amount at the time of the approval of <br /> SL-t lwas updated as a result of Midterm Review 6 (MT6). <br /> *3- As per SL-14 findings, acres had not previously been Phase III released. <br /> *4- As per SL-14 findings,Trapper redisturbed acres previously bond released. <br /> *5- As per SL-14 findings,Trapper redisturbed acres. <br /> *6- Adjustment for redisturbance as per 2014 ARR. <br /> *7- Disturbance was requested as redisturbance of bond released acres but has not yet been redisturbed. <br /> Therefore, acres remain in totals as bond released. <br /> *8—See section V of SL20 findings document for details. <br /> Submittal of Bond Release Application and Completeness Determination by the Division <br /> TMI submitted the bond release application following the procedures described in the Act and <br /> Regulations. The application also utilized the Division's Guideline Regarding Selected Coal Mine Bond <br /> Release Issues, dated April 18, 1995. <br /> The Division received TMI's Phase H bond release application SL22, on 3 September 2020, and found <br /> the application complete on 11 September 2020, after the Division received proof of publication of the <br /> applicant's public notice. The Applicant published the permitting action beginning on 7 August 2020 in <br /> the Craig Daily Press. The completeness determination was made in accordance with Section 3.03.2(l)(d). <br /> Map 1, entitled SL22 Phase II Bond Release Area Delineation and submitted with the application,shows <br /> the location of each proposed bond release parcel <br /> Bond Release Parcels <br /> SL22 requests Phase II bond release for the following seven parcels as per Table 2 and Map 1, below. <br /> Map 2 on page 8 of this document shows a close up of the main bond release block. <br /> Permit Number C1981010 <br /> SL22 Page 4 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.