My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-11_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2020-12-11_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 4:41:21 PM
Creation date
12/16/2020 4:35:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
12/11/2020
Doc Name Note
For SL21
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Permit Index Doc Type
Findings
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division's satisfaction. <br /> +f -dr l <br /> Ot <br /> 77 <br /> • <br /> Map I: Areas associated with Phase I(SL21)bond release. The light orange areas indicate <br /> the locations of the SL21 parcels. <br /> III. APPROVAL CRITERIA for BOND RELEASE <br /> Phase I Bond Release <br /> Under Colorado's Permanent Program, the process of releasing the reclamation bond for a mine site is <br /> explained in Rule 3.03 and further described in the Division's 1995 Guideline Regarding Selected Coal <br /> Mining Bond Release Issues. For Phase I bond release,Rule 3.03.1(2)(a)states: <br /> "Up to sixty percent of the applicable bond amount shall be released when the permittee <br /> successfully completes backfilling, regrading, and drainage control in accordance with the <br /> approved reclamation plan." <br /> Trapper Mine accomplishes backfilling of the mined pits primarily with draglines, using <br /> overburden and inter burden material from a cut to backfill a previous, adjacent cut. Other <br /> equipment such as bulldozers, scrapers, backhoes, front end loaders and trucks are also used to <br /> backfill areas. Once backfilled, bulldozers and/or graders grade the area to achieve approximate <br /> original contour. The approved reclamation plan for the Trapper Mine calls for backfilling and <br /> grading mine excavations and shaping the backfilled areas to the approximate configurations <br /> shown on the Postmining Topography Map, Map M12 in the permit. Graded areas are to blend <br /> Permit Number <br /> C1981010 <br /> Prepared by: R.Reilley,MS,GISP <br /> SL21 <br /> Page 7 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.