My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-11_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2020-12-11_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 4:41:21 PM
Creation date
12/16/2020 4:35:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
12/11/2020
Doc Name Note
For SL21
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining Inc
Permit Index Doc Type
Findings
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Submittal of Bond Release Application and Completeness Determination by the Division <br /> TMI submitted the bond release application following the procedures described in the Act and <br /> Regulations. The application also utilized the Division's Guideline Regarding Selected Coal Mine Bond <br /> Release Issues,dated April 18, 1995. <br /> The Division received TMI's Phase I bond release application, SL21, 3 August 2020, and found the <br /> application complete on 13 Aug 2020, after the Division received proof of publication of the applicant's <br /> public notice. The completeness determination was made in accordance with Section 3.03.2(1)(d). Map <br /> 1, entitled SL-21 Phase I Bond Release Area Delineation and submitted with the application, shows the <br /> location of each parcel. <br /> Public Notice <br /> TMI published notice of the bond release application in the Craig Daily Press once weekly for four <br /> consecutive weeks,beginning on 10 July 2020. TMI also notified landowners within and adjacent to the <br /> mine permit area, and other interested parties, of the application for bond release, as required by Section <br /> 3.03.2(1). The Division received no written comments,objections,or requests for an informal conference <br /> regarding the bond release application. <br /> Bond Release Inspection <br /> The Division conducted the bond release inspection evaluating post-mine topography on the SL <br /> parcels on 13 October 2020 in accordance with Section 3.03.2(2). Details of the Division's <br /> observations during the inspection can be found in the inspection report. <br /> The Division notified the operator, surface owners, Bureau of Land Management (BLM), the Office of <br /> Surface Mining(OSM),and the Colorado State Land Board of the inspection via certified mail. Attendees <br /> included: <br /> o Tom Medlin,Office of Surface Mining Reclamation and Enforcement(OSMRE) <br /> o Robin Reilley, Colorado Division of Reclamation,Mining,and Safety (DRMS) <br /> o Daniel Cunningham, Colorado Division of Reclamation,Mining, and Safety (DRMS) <br /> o Graham Roberts,Trapper Mining, Inc. (TMI) <br /> On 2 November 2020,DRMS sent the SL21 bond release inspection report to TMI, BLM, OSM and the <br /> Colorado State Land Board. <br /> Adequacy Review <br /> Issues discussed during the inspection consisted of maintenance items,isolated areas of erosional features <br /> in parcels FAB 16 a constructed drainage, and LAB 19. The operator addressed the problematic areas <br /> making the requisite repairs within the month. DRMS,on the subsequent inspection,deemed the repairs <br /> adequate. DRMS inspection reports document the issues and repairs made. No adequacy issues were <br /> identified that required formal correspondence and maintenance items have been addressed to the <br /> Permit Number <br /> C1981010 <br /> Prepared by: R.Reilley,MS,GISP <br /> SL21 <br /> Page 6 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.