My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-15_PERMIT FILE - M2020065 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020065
>
2020-12-15_PERMIT FILE - M2020065 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 6:17:00 AM
Creation date
12/16/2020 11:32:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020065
IBM Index Class Name
Permit File
Doc Date
12/15/2020
Doc Name
Application
From
Colorado Gators, Inc.
To
DRMS
Email Name
SJM
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and seeding with the seed mix found in Table E-3. For industrial/commercial areas within the <br /> pits, a portion of the reclaimed area will be fields for recreation made with artificial turf. For <br /> industrial/commercial areas within the soil storage area, the ground will be covered with a six- <br /> inch thick gravel layer screened from material onsite. Topsoil will be stored into the temporary <br /> stockpile area as shown on Map C-2 for rangeland reclamation. <br /> 2.1 Topsoil and Overburden Handling <br /> It is not anticipated that any topsoil will need to be imported for the reclamation process, even at <br /> the point of greatest disturbance. The soil profile is such that sufficient topsoil will always be <br /> available to topsoil all required areas to rangeland. Topsoil stripped during mining and not <br /> required for reclamation will either be sold or stored in the temporary stockpile area. Topsoil and <br /> overburden will be maintained in separate stockpiles in the temporary stockpile area. Table E-2 <br /> outlines the topsoil material balance calculations during reclamation and during the greatest <br /> disturbance area scenario. Topsoil stripping and replacement volumes are based on a 12 inches <br /> depth of topsoil. Table E-2 details the volumes produced form the Soil Storage Area and Pits 1-4. <br /> Table E-2.Topsoil and Overburden Material Balances During Reclamation <br /> GeneratedMaterial Material Required Note <br /> - <br /> clamation (Cy)2 <br /> Mining(CY)' <br /> Soil Storage i i All topsoil stripped from Soil Storage Area will be <br /> Area, retained and used in reclamation of the Soil Storage <br /> Topsoil 75,988 75,988 Area <br /> Pits 1-4, All Four Pits will be converted to Recreational Filed <br /> Topsoil with Artificial Turf,therefore no topsoil will be <br /> 110,997 0 required during reclamation. <br /> Pits 1-4,Soil i Calculated assuming an excavation depth of six total <br /> Product 554,987 i 0 feet,one foot of topsoil and five feet of soil product. <br /> Soil Product Total mined material available for sale. <br /> Site Wide <br /> (includes <br /> Topsoil and <br /> Soil Product) 665,984 0 <br /> 'Topsoil and overburden stripped during mining.Based on soil survey thicknesses and area mining experience. <br /> 'Topsoil or overburden needed to reclaim disturbed areas in said scenario. <br /> As demonstrated in Table E-2, topsoil generated by stripping will be more than enough to <br /> successfully reclaim all disturbed areas in the greatest disturbance area scenario. <br /> Mystic Soil <br /> November 2020 E-2 c arickia� �.�t�.ri t x <br />
The URL can be used to link to this page
Your browser does not support the video tag.