Laserfiche WebLink
EXHIBIT E RECLAMATION PLAN <br /> 1. Introduction <br /> This exhibit describes the plans and processes involved in reclaiming the site and transforming it <br /> to its ultimate post-mining use as a rangeland and industrial/commercial area as shown on Map <br /> F-1. Reclamation will occur contemporaneously as portions of the permit area are mined. Final <br /> reclamation of the permit area will occur after the cessation of all mining activities. Current use <br /> of the permit area is that of a rangeland. Final use of the permit area is proposed to be rangeland <br /> and industrial/commercial. Pursuant to Rule 6.4.5.2.(b),the applicant evaluated the proposed <br /> post-mining land use in regards to adopted state and local land use plans for this area and land <br /> uses in the vicinity. The proposed post-mining use as a rangeland and an industrial/commercial <br /> area is compatible with the general character of the area. The use of the reclaimed portions of the <br /> permit area for an industrial/commercial purpose is planned for yet cannot be reasonably well <br /> assured. Therefore, a plan for rangeland revegetation of the industrial/commercial areas is <br /> included. <br /> The affected area of this site is the same as the permit area of this site, 319.8 acres,not all of <br /> which will be disturbed and require reclamation. The table below provides a summary of <br /> intended end uses within the affected area upon completion of reclamation as proposed on Map <br /> F-1. <br /> Table E-1.Reclamation Areas <br /> Descriptio Area(Acres) <br /> Gravel Access Roads 0.5 <br /> Mining Area Reclaimed to Recreation Facilities 68.8 <br /> Mining Area Reclaimed to Rangeland _ 20 <br /> Reclaimed to Industrial/commercial 26.6 <br /> Disturbed Area Total(Gravel Roads,Recreational Facilities, <br /> Rangeland,and Industrial/commercial) 115.9 <br /> Undisturbed Area within the Permit Area 203.9 <br /> Total Affected Area 319.8 <br /> Note: Undisturbed area includes setbacks and incidental areas within the permit where disturbance is not <br /> needed. <br /> 2. General Reclamation Plan <br /> Mining will take place to the final topography and slopes as shown on Map F-1. Rangeland <br /> reclamation will be conducted on final graded areas by covering them with 12 inches of topsoil <br /> Mystic Soil <br /> November 2020 E-1 r. AwKw and ns.�cailc. MIA' <br />