Laserfiche WebLink
onsite. It is anticipated that no large boulders will be encountered. Excess topsoil not required for <br /> reclamation will be sold and shipped offsite. <br /> The permittee will clearly mark the permit/affected area boundary with stakes surveyed on site. <br /> No designated chemicals or acid-producing materials to be used or stored on-site. <br /> 9. Import Materials <br /> Fill material may be accepted into the mine site. Fill material will be spread out on the mine floor <br /> or stockpiled and will be blended into the final landscape. Some material may also be re-sold as <br /> construction material. None of this material can be accepted by the Operator unless the attached <br /> form is filled out by the entity bringing the material to the site. The form provides an assurance <br /> that all material brought to the site is inert and has no toxic or acid forming material above <br /> acceptable limits. <br /> Mystic Soil <br /> November 2020 D-7 / %R11 IA�kk�and lswctatcs Ni.LI <br />