My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-14_REVISION - M1977321
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977321
>
2020-12-14_REVISION - M1977321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 6:08:58 AM
Creation date
12/15/2020 6:19:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977321
IBM Index Class Name
Revision
Doc Date
12/14/2020
Doc Name
Adequacy Review Response
From
Environment, Inc.
To
DRMS
Type & Sequence
CN1
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Po.�G 3 <br /> Exhibit D - MINING PLAN <br /> Native/Pierre Mine is located in horizontally bedded buff,gypsiferous Pierre shale of lower Cretaceous <br /> age. <br /> The current operator of this clay mine began this operation in 1915 and has continuously mined to date. <br /> The mining method as approved,in the 1977 permit is similar;the only changes are the utilization of <br /> more modern efficient equipment. The primary reason for this conversion is to add approximately 24 <br /> acres to the permit area that covers the reserves leased or owned by Summit Brick and will extend the <br /> life of the mine.The additional area has been owned by the current owners for the purpose of mining <br /> since approximately 1915. <br /> The primary commodities to be produced are clay and a sand borrow material. There are not any <br /> incidental products created. The entire mining sequence is in the Pierre Shale formation. The ore body <br /> consists of clay and sand with the sand typically overlying the clay.Depth from the surface to the top of <br /> the clay/sand will vary from 1'to 5'.The usable clay varies from 0'to 15'thick.Maximum pit depth may <br /> reach the 20-foot range but average depth will be less than 15 feet. <br /> Mining will be accomplished using a dozer,loader and/or scraper depending on the distance the <br /> material is to be moved.As mining progresses through the mining area,all available topsoil will be <br /> removed,and will either be spread over areas previously graded to final slope or will be stored for <br /> future application.The overburden will then be removed and used as backfill or will be stockpiled where <br /> it will not be mixed with the topsoil.If the topsoil land overburden)stockpiles remain undisturbed for <br /> more than a year,the approved seed mix will be applied to prevent erosion,to control weeds,and to <br /> keep them viable for reclamation. The exposed clay and/or sand is then mined and stockpiled on the pit <br /> floor of a previously mined area. The mined slope along the permit boundary will be 3H to 1V or flatter, <br /> while the working face slopes in the interior of the permit boundary will be a maximum of 0.5 H to 1 V. <br /> No blasting will take place at this mine. <br /> The stockpiled material is then transported to the nearby brick plant by truck. <br /> Mining operations including the truck traffic at this pit are intermittent and typically occur in less than <br /> 30 days of the year and only as this clay type is needed by the brick factory.Activity usually occurs <br /> monthly. <br /> Map Exhibit C shows the current permit area and the area being added to the permit.Mining to date has <br /> utilized nearly all the Eastern Portion of the existing 110 Permit. <br /> Map Exhibit C-1 shows the next stage of mining consisting of the active matenai storage area, <br /> w a+wv mining area and i �eieased reclaimed area reaay tor release. Note that,that there will <br /> ce-a portions of the area-that are will e in the final stages of reclamation as mining progresses thru <br /> the mine. The maximum extent of disturbance for the stockpning-_ g and mining area will not <br /> exceed 10.0 acres. Mining will progress into additiona,area to the west only after a like sized area is <br /> reclaimed. id Feleased. <br /> This will stay a dry mining operation of clay. Except for dust suppression,no water usage is anticipated <br /> at the mine site and no surface or ground water is retained.Surface water will be diverted around the <br /> Summit Brick&Tile Company - Native/Pierre Mine 125/10 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.