My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-14_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2020-12-14_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2020 11:30:53 AM
Creation date
12/14/2020 11:07:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
12/14/2020
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company LP
Inspection Date
12/9/2020
Email Name
ZTT
JDM
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />N - Air Resource Protection <br />N - Availability of Records <br />R - Backfill & Grading <br />R - Excess Spoil and Dev. Waste <br />R - Explosives <br />N - Fish & Wildlife <br />R - Hydrologic Balance <br />R - Gen. Compliance With Mine Plan <br />N - Other <br />N - Processing Waste <br />N - Roads <br />N - Reclamation Success <br />N - Revegetation <br />N - Subsidence <br />R - Slides and Other Damage <br />N - Support Facilities On -site <br />N - Signs and Markers <br />N - Support Facilities Not On -site <br />N - Special Categories Of Mining <br />R - Topsoil <br />COMNIENTS <br />This was a aerial inspection of the Colowyo Mine flown by Brock Bowles and reported by Zach Trujillo, both of <br />the Colorado Division of Reclamation, Mining and Safety (DRMS) on December 9, 2020. No mine representative <br />was present during the inspection. Weather conditions were clear with a high temperature around fiftyfive degrees <br />fahrenheit. Ground conditions were partially snow covered. <br />BACKFILL and GRADING — Rule 4.14 <br />Contemporaneous Reclamation 4.14.1; Approximate Original Contour 4.14.2; Highwall Elimination 4.14.1(2)(f); <br />Steep Slopes 4.14.2, 4.27; Handling of Acid and Toxic Materials 4.14.3; Stabilization of Rills and Gullies 4.14.6: <br />Backfilling continues in the South Taylor pit as overburden is being moved from the active sections of the pit and <br />being placed to the east. <br />EXCESS SPOIL and DEVELOPMENT WASTE — Rule 4.09 <br />Placement; Drainage Control; Surface Stabilization: <br />The West Taylor Fill is stable. No signs of erosion or issues were observed. <br />The Collom Temporary Spoil Pile continues to expand. The pile has been expanded from the South to the North in <br />multiple lifts. The pile appears now to be close to the currently approved northern limits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.