My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-12-08_REVISION - M2008078 (27)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008078
>
2020-12-08_REVISION - M2008078 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 5:45:39 AM
Creation date
12/14/2020 7:09:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008078
IBM Index Class Name
REVISION
Doc Date
12/8/2020
Doc Name Note
Part 3 of 6
Doc Name
Request For Amendment To Permit
From
Prowers Aggregate Operators, LLC
To
DRMS
Type & Sequence
AM2
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
minimum required MLRB safety factors for non-critical structures. The proposed setback <br /> of 50 feet from the edge of the conservation easement is satisfactory. <br /> Case 6-2 - The resulting safety factors of 2.31 (static) and 1.82 (pseudo-static) during a <br /> rapid drawdown condition exceed the minimum required MLRB safety factors of 1.5 <br /> (static) and 1.3 (pseudo-static) for critical structures. The resulting safety factors of 3.85 <br /> (static) and 2.68 (pseudo-static) during a full reservoir condition also exceed the <br /> minimum required MLRB safety factors for critical structures. The proposed setback of <br /> 75 feet from the edge of the canal bank is satisfactory. <br /> Case 7-1 - The resulting safety factors of 2.40 (static) and 1.92 (pseudo-static) during a <br /> rapid drawdown condition exceed the minimum required MLRB safety factors of 1.5 <br /> (static) and 1.3 (pseudo-static) for critical structures. The resulting safety factors of 4.38 <br /> (static) and 3.05 (pseudo-static) during a full reservoir condition also exceed the <br /> minimum required MLRB safety factors for critical structures. The proposed setback of <br /> 150 feet from the electric/gas lines is satisfactory. <br /> Case 7-2 - The resulting safety factors of 1.58 (static) and 1.32 (pseudo-static) during a <br /> rapid drawdown condition exceed the minimum required MLRB safety factors of 1.5 <br /> (static) and 1.3 (pseudo-static) for critical structures. The resulting safety factors of 2.99 <br /> (static) and 2.23 (pseudo-static) during a full reservoir condition also exceed the <br /> minimum required MLRB safety factors for critical structures. The proposed setback of <br /> 80 feet from the edge of the canal bank is satisfactory. <br /> Case 8-1 - The resulting safety factors of 3.15 (static) and 2.39 (pseudo-static) during a <br /> rapid drawdown condition exceed the minimum required MLRB safety factors of 1.5 <br /> (static) and 1.3 (pseudo-static) for critical structures. The resulting safety factors of 5.42 <br /> (static) and 3.55 (pseudo-static) during a full reservoir condition also exceed the <br /> minimum required MLRB safety factors for critical structures. The proposed setback of <br /> 145 feet from the electric/gas lines is satisfactory. <br /> Case 8-2 - The resulting safety factors of 1.61 (static) and 1.33 (pseudo-static) during a <br /> rapid drawdown condition exceed the minimum required MLRB safety factors of 1.5 <br /> (static) and 1.3 (pseudo-static) for critical structures. The resulting safety factors of 2.93 <br /> (static) and 2.19 (pseudo-static) during a full reservoir condition also exceed the <br /> minimum required MLRB safety factors for critical structures. The proposed setback of <br /> 60 feet from the electric line/poles is satisfactory. <br /> Case 8-3 - The resulting safety factors of 2.21 (static) and 1.77 (pseudo-static) during a <br /> rapid drawdown condition exceed the minimum required MLRB safety factors of 1.5 <br /> (static) and 1.3 (pseudo-static) for critical structures. The resulting safety factors of 3.79 <br /> (static) and 2.70 (pseudo-static) during a full reservoir condition also exceed the <br /> minimum required MLRB safety factors for critical structures. The proposed setback of <br /> 75 feet from the edge of road is satisfactory. <br /> West Farm Gravel Pit Expansion <br /> Slope Stability Analysis <br /> Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.