Laserfiche WebLink
Table 3 - Pseudo-Static Condition Slope Stability Analysis Results <br /> Description Calculated Required <br /> Factor Minimum <br /> of Safety Factor of <br /> Safety <br /> Case 3-1 -Ditch Bank West of Phase 3-Full Reservoir 2.57 1.3 <br /> Case 3-1 -Ditch Bank West of Phase 3-Rapid Drawdown 1.54 1.3 <br /> Case 3-2- Highway Parcel East of Phase 3-Full Reservoir 2.14 1.15 <br /> Case 3-2-Highway Parcel East of Phase 3-Rapid Drawdown 1.24 1.15 <br /> Case 3-3-Highway Parcel North of Phase 3-Full Reservoir 1.99 1.15 <br /> Case 3-3- Highway Parcel North of Phase 3-Rapid Drawdown 1.16 1.15 <br /> Case 4-1 -Electric Line/Poles East of Phase 4-Full Reservoir 2.32 1.3 <br /> Case 4-1 -Electric Line/Poles East of Phase 4- Rapid Drawdown 1.42 1.3 <br /> Case 4-2- Ditch Bank South of Phase 4- Full Reservoir 2.31 1.3 <br /> Case 4-2- Ditch Bank South of Phase 4- Rapid Drawdown 1.38 1.3 <br /> Case 5-1 -Conservation Easement East of Phase 5-Full Reservoir 1.92 1.15 <br /> Case 5-1 -Conservation Easement East of Phase 5-Rapid Drawdown 1.17 1.15 <br /> Case 5-2-Canal Bank South of Phase 5-Full Reservoir 2.72 1.3 <br /> Case 5-2-Canal Bank South of Phase 5-Rapid Drawdown 2.00 1.3 <br /> Case 6-1 -Conservation Easement East of Phase 6-Full Reservoir 1.97 1.15 <br /> Case 6-1 -Conservation Easement East of Phase 6-Rapid Drawdown 1.17 1.15 <br /> Case 6-2-Canal Bank South of Phase 6-Full Reservoir 2.68 1.3 <br /> Case 6-2-Canal Bank South of Phase 6-Rapid Drawdown 1.82 1.3 <br /> Case 7-1 - Elec/Gas Lines North of Phase 7-Full Reservoir 3.05 1.3 <br /> Case 7-1 -Elec/Gas Lines North of Phase 7-Rapid Drawdown 1.92 1.3 <br /> Case 7-2-Canal Bank South of Phase 7-Full Reservoir 2.23 1.3 <br /> Case 7-2-Canal Bank South of Phase 7-Rapid Drawdown 1.32 1.3 <br /> Case 8-1 - Elec/Gas Lines North of Phase 8-Full Reservoir 3.55 1.3 <br /> Case 8-1 -Elec/Gas Lines North of Phase 8-Rapid Drawdown 2.39 1.3 <br /> Case 8-2-Elec Line/Poles West of Phase 8-Full Reservoir 2.19 1.3 <br /> Case 8-2- Elec Line/Poles West of Phase 8-Rapid Drawdown 1.33 1.3 <br /> Case 8-3-County Road HH.5 South of Phase 8- Full Reservoir 2.70 1.3 <br /> Case 8-3-County Road HH.5 South of Phase 8-Rapid Drawdown 1.77 1.3 <br /> Case 8-4-Highway Parcel East of Phase 8-Full Reservoir 2.14 1.15 <br /> Case 8-4- Highway Parcel East of Phase 8- Rapid Drawdown 1.33 1.15 <br /> VII - CONCLUSIONS AND RECOMMENDATIONS <br /> Case 3-1 - The resulting safety factors of 1.85 (static) and 1.54 (pseudo-static) during a <br /> rapid drawdown condition exceed the minimum required MLRB safety factors of 1.5 <br /> (static) and 1.3 (pseudo-static) for critical structures. The resulting safety factors of 3.47 <br /> (static) and 2.57 (pseudo-static) during a full reservoir condition also exceed the <br /> minimum required MLRB safety factors for critical structures. The proposed setback of <br /> 85 feet from the edge of the ditch bank is satisfactory. <br /> West Farm Gravel Pit Expansion <br /> Slope Stability Analysis <br /> Page 6 <br />