Laserfiche WebLink
3h:1v final reclaimed slopes will be established concurrently as mining progresses through the <br /> phases. At the completion of mining of each phase, topsoil, and seed will be placed above the <br /> reservoir water line on all disturbed areas in that phase. At the completion of mining of all <br /> phases, topsoil and seed will be placed on the disturbed areas in the west wash plant and <br /> sediment pond area, and the Parcel B area. <br /> Prowers Aggregate Operators, LLC. <br /> JaT Consulting,Inc. West Farm Pit—M-2008-078 <br /> DRMS 112 Permit Amendment Application <br />