Laserfiche WebLink
Groundwater—Specific Requirements <br /> The operation will not affect groundwater quality on or off the site. The operation will comply <br /> with State groundwater quality standards. Due to the groundwater being commingled with <br /> stormwater and product wash water prior to being discharged, stormwater and groundwater <br /> discharge quality standards are being monitored per the approved CDPS discharge permit for <br /> the site, Permit No. COG 501574. The CDPS discharge permit is attached for your reference. <br /> The mining and reclamation may affect the groundwater table surrounding the mine site. The <br /> proposed mitigation efforts to minimize these impacts are to install a slurry wall around the <br /> perimeter of each cell to maintain groundwater levels during the mining, and a perimeter drain if <br /> needed to convey groundwater around the lined reservoir after the pit side liner is installed. <br /> Prowers Aggregate Operators, LLC proposes that they continue to monitor groundwater levels <br /> through both onsite and offsite monitoring wells that they have installed, or have access to <br /> before, during, and after the mining and reclamation is complete so that impacts to the <br /> groundwater table, from this mining operation, can be identified and addressed. It is the intent of <br /> Prowers Aggregate Operators, LLC to operate responsibly and to mitigate any damage to wells <br /> that is directly attributable to the mining and reclamation of this site. <br /> Reclamation Timetable <br /> The reclamation of Phase 1 is complete. Phases 2-9, and the other disturbed areas are <br /> estimated to be reclaimed according to the following sequence and timeline: <br /> Phase/ Location Phase/ Estimated Time Estimated Total <br /> Sequence Location Required to Reclamation Time <br /> Area Reclaim Phases (years) <br /> acres ears <br /> Parking Area on the 6.25 Reclamation Complete 0 <br /> North Side of the Site/ <br /> Disturbed Areas <br /> Adjacent to the Pit Road <br /> West of Phase 1 / <br /> Along the Ditch to the <br /> River North of the Pit <br /> 1 36.31 Reclamation Complete 0 <br /> 2 75.09 1 1 <br /> 3 128.09 5 6 <br /> 4 237.82 9.5 15.5 <br /> 5 164.44 2.5 18 <br /> 6 195.02 4.5 22.5 <br /> 7 121.68 3.75 26.25 <br /> 8 32.66 0.75 27 <br /> 9 91.38 2.75 29.75 <br /> West Wash Plant and 41.29 0.5 30.25 <br /> Sediment Pond Area/ <br /> Parcel B Area (Includes estimated time <br /> required for seed to <br /> germinate and become <br /> established <br /> M Prowers Aggregate Operators, LLC. <br /> �' JeT Consulting,Inc. West Farm Pit—M-2008-078 <br /> DRMS 112 Permit Amendment Application <br />