Laserfiche WebLink
Percentages <br /> State NA Federal NA Local Agency NA <br /> 17. What post mining land uses will be made of the extraction and why? (This <br /> question helps us determine the intent of the activity.) <br /> 1-2-nd-OWne r Wants the old raffilbed to he removed to expand the area availablia <br /> for grazing of livestock or planting to crops The reason the landOlNner <br /> contacted CAS I I C was to do this land imwrovement <br /> 18. What types and sizes of equipment will be used in the extraction? <br /> Standard r-nnstruction eql lipment to excavate- front-end loader (5-T-) andlor <br /> backhoe (wheeled or tracked), with Tandem dumptruck uck (2.5 - 2.5 T canarity)_ <br /> Removal of tramp steel, screening and crushing of rock will be done using a <br /> tracked or wheeled portable unit, such as a Metso Lokotrak LT220D (100 TPH) <br /> Please send the completed questionnaire to the Division at the address above for review. <br /> The Board has directed the Division to make a decision based on the information you have <br /> supplied. We trust that the activities will be performed as represented. If we receive a <br /> complaint, we are required by law to conduct an inspection of the site. Which could result <br /> in a violation, a cease and desist order, and other corrective actions including submittal of <br /> a permit application. <br /> If you have any questions, please contact the Division at (303)866-3567. Please feel free <br /> to visit our web site at: https:Hcolorado.gov/drms for further access to the full Act and <br /> Rules governing extraction of metals, non-metals, and construction materials in the State <br /> of Colorado. <br /> Sincerely, <br /> Division of Reclamation, Mining and Safety Staff <br /> Enclosure: Rule 1.2 excerpt for Hard Rock Metal Mines and Construction Materials <br /> Rule 1.2 excerpt for Hard Rock/Metal Mining <br /> Page 4 of 6 <br />