Laserfiche WebLink
8. What is the approximate areal extent of the proposed extraction in acres? <br /> 1 .4 <br /> 9. To what approximate depth will the extraction extend? <br /> 4-5 ft Removal of railbed to approximately historical surface, but <br /> smoothed to allow for planting and better grazing. <br /> 10. In cubic yards, approximately how much material will be removed: <br /> 4-1 Ok Depending on the quality of material and amount of fines, as well <br /> as the variation in fill heights, between 4,000 and 10,000 CY <br /> 11. Will material extraction involve the use of explosives? <br /> Yes ❑ No ❑✓ <br /> 12. Will site of extraction result in the exposure of tributary ground water? <br /> Yes ❑ No ❑✓ <br /> All material to be extracted is above natural ground <br /> level and above the water table. <br /> 13. Will either the landowner or the mine site operator receive any type of <br /> compensation, i.e., monetary, in-kind, haulage fees, etc., from the proposed <br /> material extraction? <br /> CAS LLC will sell construction material to offset cost <br /> Yes ❑✓ No LL of removal of the old railbed, and may pay royalty to <br /> landowner. <br /> 14. Please supply a copy of any documents that will ensure that the area of extraction <br /> will be reclaimed to some beneficial land use once extraction activities have been <br /> completed. This will be ensured by contract between landowner and CAS LLC, <br /> and County grading permit. <br /> 15. Do you have permits for this activity from any other governmental agencies such <br /> as building, construction, or grading permits, and if so, what are they? <br /> Anticipate a grading permit and road access permit may be required bye <br /> Plata County. although this may qualify for exemption as agricultural work <br /> 16. Are there state/federal/local agency participants in terms of funding? <br /> Yes ❑ No <br /> Funding <br /> Yes ❑ No ❑ <br /> Design ✓ <br /> Page 3 of 6 <br />