Laserfiche WebLink
ENVIRONMENTAL ASSESSMENT <br /> Table 3-2.Total Project Emissions(Tons) <br /> Source PM10 PM2.5 CO NOx VOC S02 CO2 CH4 N20 <br /> Annual <br /> Unpermitted 3.83 3.74 14.87 39.56 26.49 0.64 N/A N/A N/A <br /> Sources <br /> Annual <br /> Permitted 29.10 4.00 N/A N/A N/A N/A N/A N/A N/A <br /> Sources' <br /> Low-cover 2.6 0.5 2.4 4.6 0.6 0.01 N/A N/A N/A <br /> Crossing <br /> Annual <br /> Tota12 35.53 8.24 17.27 44.16 27.09 0.65 N/A N/A N/A <br /> Lifetime <br /> Unpermitted N/A N/A N/A N/A N/A N/A 49,304 13,606 0.54 <br /> Sources <br /> Lifetime <br /> Permitted N/A N/A N/A N/A N/A N/A N/A N/A N/A <br /> Sources <br /> Low-cover N/A N/A N/A N/A N/A N/A 1,630 89.86 40.99 <br /> Crossing <br /> Lifetime TotalZ N/A N/A N/A N/A N/A N/A 50,934 13,696 41.53 <br /> 1 The permitted emissions include both point and fugitive sources and annual emissions that were derived from the <br /> CDPHE permit that allows 1.3 mt production as shown in Table 2.2-9 in the TRR. <br /> 2GHG emissions are considered longer term pollutants than annually because they tend to stay in the atmosphere <br /> for much longer periods of time. Criteria pollutants are assessed on an annual because of shorter averaging period <br /> standards. <br /> Indirect Effects <br /> Indirect air emissions from the Proposed Action were estimated for activities that are reasonably <br /> foreseeable and include: coal transport (where the destination is within the USA and the quantity of <br /> delivered coal is known), mine worker commutes, and downstream coal combustion. Specific <br /> transportation emissions are located in Table 3-6 of the 2017 Lease Modification EA (BLM and OSMRE <br /> 2017)and under the Proposed Action would continue for the next 22 years. <br /> On average, approximately 448,785 tpy is transported by truck to the rail terminal in Gallup, New Mexico <br /> for delivery to GCC plants in Mexico and to variable cement plant buyers in the Southwest depending on <br /> markets, alternative fuels, and coal supply. GCCE supplies approximately 193,100 tons of coal to two <br /> cement kilns and two narrow gauge railroads directly, while the remainder of the coal is shipped (via the <br /> Gallup, NM rail terminal)to GCC cement plants in Mexico (240,000 tpy) and to variable cement facilities <br /> in Arizona and Texas. Both GCC cement kilns operate under state issued air permits, and both facilities are <br /> subject to Title V permitting requirements (i.e.,they are classified as major stationary sources). <br /> Dunn Ranch Area Coal Lease by Application COC-78825 and Mine Plan Modification EA 3-9 <br />