Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />I I Scraper I Push Dozer I Source I <br />I Job Efficiencv: 1 0.830 1 NA I (CAT HB) I <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />HaulRoute: <br />Site Altitude: 7500 feet <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Trawl Time <br />(ndn) <br />1 <br />568.00 <br />-7.00 <br />2.00 <br />-5.00 <br />2972 <br />0.25 <br />HaulTime: 0.25 minutes <br />Return Route: <br />Seg# <br />Haul Distance (R) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />001n) <br />Travel Time <br />(min) <br />1 <br />568.00 <br />7.00 <br />2.00 <br />9.00 <br />1711 <br />0.40 <br />Return Time: <br />0.40 <br />minutes <br />Total Scraper teamcycle time: <br />2.25 <br />minutes <br />Adjustedforjob conditions: <br />1,283.73 <br />LCY/Hour <br />Selected Numberof Scrapers: <br />2 <br />Scraper(s) <br />Adjustedsingle scraper team(unit) hourly production: <br />1,283.73 <br />LCY/Hour <br />Adjustedmuhiplescraper team (fleet)hourly production: <br />5,134.93 <br />LCY/Hour <br />Unadjustedunit production/hour: 1,546.67 LCY/Hour <br />Optimal Numberof Scrapers perpush <br />dozer: <br />JOB TIME AND COST <br />Fleet size: 4 Team(s) Totaljob time: 34.66 Hours <br />Unit cost: $0.562 /LCY Totaljob cost: $100,120 <br />