Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Scaper Poly ID S-28 (Map 35A) <br />Site: Colowyo Coal Mne Permit Action: RN7 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: <br />049 <br />Date: <br />1/16/2018 <br />Us er: <br />ZTT <br />State: Colorado Abbreviation: None <br />County: Moffat Filename: C019-049 <br />Agency or organization name <br />HOURLY EQUIPMENT <br />DRMS <br />Des <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Duma Area: NA <br />COSTShiftbasis: 1 per day <br />Road Maintenance —Motor Grader: I CAT 16M <br />-Water Truck: I Water Tanker. 5.000 Gal. <br />C'nstBreakdown: Scraner Work Team <br />Sunnort Fnuinment <br />Maintenance Fouinment <br />Totalworkteam cost/hour: $2.888.25 <br />MATERIAL QUANTITIES <br />Initial volume: 178,000 CCY Swell factor: 1.000 <br />Loose volume: 178,000 LCY <br />Source of estimated volume: Table 7 Exh. 13B -T-20 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />MotorGrader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$152.84 <br />NA <br />NA <br />NA <br />$72.40 <br />$24.01 <br />Operating cost/hour: <br />$158.39 <br />NA <br />NA <br />NA <br />$14.49 <br />$8.53 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripperown. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripperop. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.26 <br />NA <br />NA <br />NA <br />$28.90 <br />$0.00 <br />Unit Subtotals: <br />$342.49 <br />NA <br />NA <br />NA <br />$115.79 <br />$32.54 <br />Numberof Units: <br />8 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$2,739.92 <br />Support: <br />$0.00 <br />Maint: <br />$148.33 <br />Totalworkteam cost/hour: $2.888.25 <br />MATERIAL QUANTITIES <br />Initial volume: 178,000 CCY Swell factor: 1.000 <br />Loose volume: 178,000 LCY <br />Source of estimated volume: Table 7 Exh. 13B -T-20 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Materialweight: <br />1 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />User Provided <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />AverageVolume: <br />29.00 <br />LCY <br />Payload Capacity: <br />81,600.00 ICY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />