My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-20_REVISION - C1992081
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2020-11-20_REVISION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 10:45:06 AM
Creation date
11/23/2020 7:00:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
11/20/2020
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
MT6
Email Name
TNL
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br /> Task description: Rip Facilities Area <br /> Site: Hayden Gulch Loadout Permit Action: MT6 Permit/Job#: C1992081 <br /> PROJECT IDENTIFICATION <br /> Task#: 006 State: Colorado Abbreviation: None <br /> Date: 11/19/2020 County: Routt Filename: 006 <br /> User: TNL <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D10T- IOSU Horsepower: 574 <br /> Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $170.04 NA <br /> Operating Cost/Hour: $153.03 100 <br /> Ripper Ownership Cost/Hour: $20.48 NA <br /> Ripper Operating Cost/Hour: $12.29 100 <br /> Operator Cost/Hour: $41.30 NA <br /> Total Unit Cost/Hour: $397.13 <br /> Total Fleet Cost/Hour: $397.13 <br /> MATERIAL QUANTITIES Selected estimating method: Area <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 1.60 acres Rip Depth(ft): 2.50 Volume: 6,453 BCY or CCY <br /> Source of estimated quantity: PAP Volume II,Tab 12 <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: NA feet/second <br /> Area: <br /> Average Ripping Depth: 2.87 feet/pass <br /> Average Ripping Width: 8.67 feet/pass <br /> Average Ripping Length: 200.00 feet/pass <br /> Average Dozer Speed: 88.00 feet/minute <br /> Average Maneuver Time: 0.25 minutes/pass <br /> Production per unit area: 0.947 acres/hour <br /> Job Condition Correction Factors <br /> Unadjusted Hourly Unit Production: 0.947 Acres/hr <br /> Site Altitude: 6,400 feet <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Adjusted Hourly Unit Production: 0.79 Acres/hr <br /> Adjusted Hourly Fleet Production: 0.79 Acres/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Grader(s) Total job time: 2.04 Hours <br /> Unit cost: $505.373 Per acre Total job cost: $809 <br />
The URL can be used to link to this page
Your browser does not support the video tag.