My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-20_REVISION - C1992081
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2020-11-20_REVISION - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 10:45:06 AM
Creation date
11/23/2020 7:00:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
11/20/2020
Doc Name Note
Findings & Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Hayden Gulch Terminal, LLC
Type & Sequence
MT6
Email Name
TNL
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.115 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.868 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4338 <br /> Adjusted unit 745.66 LCY/hr <br /> production: <br /> Adjusted fleet 745.66 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.516/LCY <br /> Total job time: 5.94 Hours <br /> Total job cost: $2,284 <br />
The URL can be used to link to this page
Your browser does not support the video tag.