My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-17_REVISION - M1977342 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2020-11-17_REVISION - M1977342 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 5:35:47 AM
Creation date
11/17/2020 9:31:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Revision
Doc Date
11/17/2020
Doc Name
Certification of Construction
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR30
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Protection Facility Certification <br /> Henderson Mine — Permit No. M-1977-342 <br /> Technical Revision 30 <br /> Seepwater Detention Berm Road Raise Project <br /> The Seepwater Detention Berm Road Raise Project was approved as Technical Revision No. <br /> 30 to Mine Permit No. M-1977-342 on September 19, 2018. This project is located at Climax <br /> Molybdenum Company's Henderson Mill in Grand County. The project involved the <br /> construction of an embankment raise of the access road berm for the Primary Seepwater <br /> Collection and Detention Area (SDA) below 1 Dam. The undersigned was responsible for the <br /> design of the seepwater berm road raise. <br /> Henderson Mill personnel have substantially completed the construction of the project. The <br /> design earthwork raise was achieved. The 1 Dam Primary SDA volumetric storage capacity <br /> increased from 29.5 acre-feet to 85.4 acre-feet, which is greater than the design criteria of 68 <br /> acre-feet to detain the 100-year ARI snowmelt. Geometric changes to the road width and <br /> length from design to construction were for access and traffic flow considerations and do not <br /> affect the design storage capacity or road berm stability. Record Drawings of the project are <br /> attached. <br /> Pursuant to Rule 7.3.2, the Professional Engineer that has signed and sealed below certifies <br /> that the project was completed in general conformance with the approved design as submitted <br /> to the Division of Reclamation, Mining, and Safety. This statement is based in part on <br /> information that has been provided by others. <br /> O�'Ojq�C�ti <br /> �CC 48387 <br /> .�v <br /> December 13, 2019 <br /> Trevor E. Mugele, P.E. Date <br /> W. W. Wheeler and Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.