My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-11-09_INSPECTION - C1981008
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981008
>
2020-11-09_INSPECTION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 2:13:53 PM
Creation date
11/9/2020 2:00:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Inspection
Doc Date
11/9/2020
Doc Name
Inspection Report
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Inspection Date
11/3/2020
Email Name
LJW
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 3, 2020 C-1981-008/New Horizon Mine LJW <br />TOPSOIL — Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />The operator has moved material from the facilities area topsoil stockpiles to topsoil stockpile 12 in <br />Section 36 (north of BB road and west of 2700 road) The pile area has been shaped and ripped but not yet seeded <br />and can be seen in Photo Four. Topsoil that was moved is not needed for final reclamation at the facilities area, <br />but will be utilized when the operator spreads the topsoil in this final area. Some material was also taken to <br />Topsoil stockpile 1113. The soil moved to the I IB area has been placed shown in Photo Five, but not yet disced or <br />seeded. Conversations with the Operator indicate that discing and seeding will take place very soon, likely before <br />any significant snow fall is received. There was no signs of erosion on the newly stockpiled materials. <br />At the facilities area topsoil stockpile D remains, a portion of stockpile H remains, Topsoil stockpile C has been <br />utilized or moved, and most of topsoil stockpile E has been utilized. Some final grading and shaping of topsoil <br />stockpile C, E and H footpints remain to be done. <br />ENFORCEMENT ACTIONS/COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.