Laserfiche WebLink
13 October 2020 C-1981-010/Trapper Mine RAR <br />1. Reconstructed drainage in parcel FA16 required <br />repair work at the time of inspection to establish <br />additional stability in the longitudinal profile of <br />the channel. The operator, in a timely manner <br />carried out the mitigation work suggested by <br />DRMS as illustrated in photo 1. The operator <br />repaired the area as per photos 2 and 3 below by <br />blading and cleaning out check dams. <br />t ; <br />Photo 1: Gully forming in the lower portion of <br />constructed drainage FA16. The feature measures <br />approximately 2 feet wide, 1. S feet deep and 30 feet <br />in length. <br />Photo 2: Operators photos of repairs made in <br />constructed channel FA16. <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Map I:Location of the gully (turquoise dot) <br />depicted in the photo at the left. <br />PENEMMOr"W <br />Photo 3: Operators photos of repairs made in <br />constructed channel FA16. <br />