My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-29_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2020-10-29_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 1:41:08 PM
Creation date
10/29/2020 7:23:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
10/29/2020
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
GCC Energy, LLC
Type & Sequence
PR10
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. The Division finds that no specific approvals required under Rule 4 are necessary for this <br />mine plan. (2.07.6(2)(m)). <br />15. The Division finds that the activities proposed by the applicant would not affect the <br />continued existence of endangered or threatened species or result in the destruction or <br />adverse modification of their critical habitats (2.07.6(2)(n)). <br />Colorado Parks and Wildlife, and U.S. Fish and Wildlife were notified on June 30, 2020 of <br />the proposed permit revision. No comments have been received from either agency <br />regarding concerns with this revision. There are no proposed surface disturbances <br />associated with this permit revision. <br />16. The Division has contacted the Office of Surface Mining, Reclamation Fees Branch. As of <br />this time, GCC Energy, LLC, the operator is current in the payment of reclamation fees <br />required by 30 CFR Chapter VII, subchapter R (2.07.6(2)(o)). <br />Section B - Rule 4 <br />Roads - Rule 4.03 <br />A. Haul Roads <br />There are no haul roads proposed with this permit revision. No surface disturbance <br />is proposed with PR10. The proposed parcels requested for inclusion in this permit <br />revision may be affected by underground mining activities. <br />B. Access Roads <br />There are no access roads proposed with this permit revision. No surface <br />disturbance is proposed. The proposed parcels requested for inclusion in this <br />permit revision may be affected by underground mining activities. <br />C. Light -Use Roads <br />There are no light use roads proposed with this permit revision. No surface <br />disturbance is proposed. The proposed parcels requested for inclusion in this <br />permit revision may be affected by underground mining activities. <br />II. Support Facilities - Rule 4.04 <br />There are no support facilities proposed with this permit revision. No surface <br />disturbance is proposed. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.