Laserfiche WebLink
20. State that no trees/nursery stock will be used. <br /> Please see the revised Exhibit E. <br /> 21. State that no fertilizer will be used. <br /> Please see the revised Exhibit E. <br /> 22. State the maximum reclaimed slope. <br /> Please see the revised Exhibit E. <br /> Exhibit G <br /> 23. Commit to providing the Division with a copy of the wetland study and make permit <br /> revisions as necessary. <br /> The Division will be provided with a copy of the wetland study for the site. If the results of the <br /> study necessitate revisions to the permit, a technical revision will be filed. <br /> 24. Section 7.1-Typo should be Area 1 described first then Area 2 described, not Area 2 <br /> twice <br /> Please see the revised Exhibit E. <br /> 25. Typically one permit is not dependent on another. Explain the rational for using M- <br /> 1900- 094 to dewater Area 2 rather than pumping into Area 1. <br /> The Orchard Grove Industrial Pit (M-1990-094) has an active CDPHE discharge permit for <br /> dewatering. Using that pit,while present, as a sediment pond for Area 2 dewatering will facilitate <br /> Area 2 mining for the landowner of both pits (A&G Partnership)while avoiding a water line <br /> across a public road. <br /> 26. De-watering of Area 2 is dependent on the neighboring Orchard Grove Industrial Pit <br /> (M- 1990-094). Please provide documentation from CDPHE that this is an acceptable <br /> means of discharge.Additionally M-1990-094 will need a technical revision to make <br /> commitments to support the M-2020-035 operation with regards to dewatering through <br /> life ofmine, <br /> Elam has reached out to CDPHE for documentation that running the Area 2 dewatering water <br /> through Orchard Grove Industrial Pit's (OGIP) existing discharge permit(COG500263) is <br /> feasible. In case it is determined to be infeasible, an additional dewatering pump location, <br /> sediment pond, and discharge point has been added to Area 2. It can be seen on Map C-2. This <br /> alternative location will be the fallback for Area 2 dewatering under its own CDPHE permit. The <br /> alternative discharge point on the north side of Area 2 can also be used in the event that OGIP is <br /> not able to take on Area 2's dewatering flow. <br /> 27. Section 7.1-does M-1990-094 also discharge into the Wilsea Drain?If not clarify the <br /> discharge point that Area 2 would ultimately use. <br /> 23 114 West Pit 5 <br /> October 2020 -- <br />