Laserfiche WebLink
TASK 001 STRUCTURE DEMO BREAKDOWN <br /> Structure or Item Description Dimensions Demolition Quantity Unit Unit Cost Total Cost SL5 <br /> Menu Selection <br /> mine office Trailer Bldg.(SN) 1,792.00 CF $0.20 $353.02 <br /> demo./on-site disposal in excavated pit-Max. <br /> 200 ft.push $353.02 <br /> VP/General Manager's Office Trailer Bldg.(SN)demo./on-site disposal in excavated 1,792.00 CF $0.20 $353.02 <br /> pit-Max.200 ft. <br /> push $353.02 <br /> Engineering Office Trailer Bldg.(SN)demo./on-site disposal in excavated 1,792.00 CF $0.20 $353.02 <br /> pit-Max.200 ft. <br /> push $353.02 <br /> Training Office/Maintenance Office Trailer Bldg.(SN)demo./on-site disposal in excavated 1,792.00 CF $0.20 $353.02 <br /> pit-Max.200 ft. <br /> push $353.02 <br /> Shop at No.5 Portal 150'x50'x15' Bldg.(MN)demo./on-site disposal in excavated 112,500.00 CF $0.22 $24,300.00 <br /> pit-Max.200 ft. <br /> push $24300.00 <br /> -Footers 1'X2'X400 LF Demo.and on-site disposal in excavated pit, 400.00 LF $3.58 $1,432.00 <br /> 1.0 ft.x 2 ft.-Max.200 ft.push <br /> $1432.00 <br /> -Pad 150'x50'x6" Demo.and on-site disposal in excavated pit, 7,500.00 SF $0.85 $6,397.50 <br /> 6 in.thick- <br /> $6397.50 <br /> Warehouse at No.5 Portal 60'x100'x15' Bldg.(MN)demo./on-site disposal in excavated 90,000.00 CF $0.22 $19,440.00 <br /> pit-Max.200 ft.push $19440.00 <br /> -Footers 1'x2'x312 Demo.and on- 312.00 LF $3.58 $1,116.96 <br /> LF site disposal in excavated pit, <br /> 1.0 ft.x 2 ft.-Max.200 ft.push $1116.96 <br /> -Pad 60'x100'x6" Demo.and on-site disposal in excavated pit,6 6,000.00 SF $0.85 $5,118.00 <br /> in.thick-Max.200 ft. <br /> push $5118.00 <br /> Carpenter Shop 50'x20'x10' Bldg.(MN)demo./on-site disposal in excavated 10,000.00 CF $0.22 $2,160.00 <br /> pit-Max.200 ft.push $2160.00 <br /> -Footers 1'x2'x132 Demo.and on- 132.00 LF $3.58 $472.56 <br /> LF site disposal in excavated pit, <br /> 1.0 ft.x 2 ft.-Max.200 ft. <br /> push $472.56 <br /> Brazell-Simms Building 60'x40'x15' Bldg.(MN)demo./on-site disposal in excavated 36,000.00 CF $0.22 $7,776.00 <br /> pit- <br /> Max.200 ft.push $7776.00 <br /> -Footers 1'x2'x192 LF Demo.and on-site disposal in excavated pit, 192.00 LF $3.58 $687.36 <br /> 1.0 ft.x 2 ft.-Max.200 ft.push <br /> $687.36 <br /> -Pad 60'x40'x4" Demo.and on- 2,400.00 SF $0.57 $1,365.60 <br /> site disposal in excavated pit,4 in.thick-Max. <br /> 200 ft. <br /> push $1365.60 <br /> No.9 Portal Warehouse/Bathhouse 24'x50'x12' Bldg.(MN)demo./on-site disposal in excavated 43,200.00 CF $0.22 $9,331.20 <br /> pit- <br /> Max.200 ft.push $9331.20 <br /> -Footers 1'x2'x420 LF Demo.and on-site disposal in excavated pit, 420.00 LF $3.58 $1,503.60 <br /> 1.0 ft.x 2 ft.-Max.200 ft. <br /> push <br /> $1503.60 <br /> Reclamatin Building(Pole Barn) 70'x100'x15' Bldg.(MN)demo./on-site disposal in excavated 105,000.00 CF $0.22 $22,680.00 <br /> pit-Max.200 ft.push $22680.00 <br /> 1 <br />