My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-15_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-10-15_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 8:26:14 AM
Creation date
10/15/2020 7:35:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
10/15/2020
Doc Name
Adequacy Review Response #2
From
Trapper Mining Inc
To
DRMS
Type & Sequence
PR10
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 13 <br />Rule 4.09.1( ): Disposal of Excess Spoil <br />DRMS August 2020 <br />The Division of Reclamation, Mining and Safety (DRMS), has reviewed Evaluation ofl and JPit <br />Spoil Pile Stability Report by Agapito Associates. Inc. dated May 26, 2019 for the Trapper Mine <br />Permit Revision PR-10. <br />1. In the Conclusion and Recommendations section of the report, the Operator states the spoil <br />piles will be constructed in small lifts (20-40 feet) to allow for better compaction of the spoil <br />particles. Pursuant to Rule 4.09.1(7), please explain how the spoil piles will be concurrently <br />compacted to ensure mass stability and prevent mass movement. <br />2. Please provide the Rockscience Inc. slope stability analysis data for the Agapito <br />Associates, Inc. geotechnical evaluation of the I and JPits Spoil Piles to allow the Division <br />to duplicate the analysis with Clover Technology's Galena software for verification <br />purposes. Please include the profile geometries and the material properties used in the <br />stability analysis, preferably in paper and electronic forms. <br />Trapper Response to Comment 4. <br />The spoil piles will be dumped in 20 foot lifts for the most part with the large overburden trucks <br />providing the required compaction for the layers offill. To sort the rock required for the underdrain, <br />taller dump faces, up to 40 feet tall, will be utilized to collect the rock. Even allowing for this taller <br />face, the compaction provided during this process allows for safetyfactors above 1.75 at the worst <br />case, exceeding the 1.5 criterion. <br />DRMS October 2020 <br />Trapper's response is adequate. <br />Trapper Response to Comment 5: <br />The profile geometries are included separately as DXF files so that they may be opened as digital files <br />and measurements taken from them. They are called A Section through D Section and their <br />material properties are included in Table 1, Summary Numerical Model Input Parameters, Page 4 of <br />Agapito Associates, Inc. report `Re: Evaluation of I and J Pit Spoil Pile Stability, Trapper Mine. <br />DRMS October 2020 <br />Trapper's response is adequate with the exception of: <br />5a. Please export the x,y coordinates from the DXF file crossections A-D into an excel file <br />and submit the excel file to DRMS. <br />Trapper Response to Comment 5a: <br />Trapper has provided the information it can in regard to the drawings and model data used in the Agapito <br />study of spoil pile analysis for the I and J Pits. Trapper was unable to provide the exact information <br />requested above as it does not exist within the supplied drawings. After further discussions with DRMS <br />personnel the issue has been resolved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.