My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-10-15_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2020-10-15_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2020 8:26:14 AM
Creation date
10/15/2020 7:35:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
10/15/2020
Doc Name
Adequacy Review Response #2
From
Trapper Mining Inc
To
DRMS
Type & Sequence
PR10
Email Name
JLE
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 12 <br />3. Please clarify andjustify the cost estimate submitted with the application. <br />Trapper Response: <br />The overburden removal/mining sequence in I and Jpits utilizes the waste material from one pit to <br />backfilled into another pit. The waste material from the initial pit must be placed in an out ofpit <br />spoil dump. Spoil material from subsequent pits is hauled back to the prior mined out pit. This <br />results in the prior pit being backfilled as the new pit is being developed. Therefore the <br />assumption was made that before the Worst -Case Bond Year occurs, most of the I and Jpit <br />complex would be backfilled, topsoiled and revegetated to the Worst -Case Bond Year of 2022. <br />2020 <br />2021 <br />2022 <br />Total <br />Acres <br />Acres <br />Acres <br />Acres <br />Disturbed Acres <br />I Pit Middle <br />31.9 <br />31.9 <br />I Pit East <br />37.7 <br />37.7 <br />J Pit Middle <br />56.5 <br />56.5 <br />J Pit East <br />28.4 <br />51.5 <br />79.9 <br />08 Pile <br />0.9 <br />0.9 <br />Total Disturbed <br />61.1 <br />145.6 <br />206.7 <br />Reclaimed Acres <br />I Pit Middle <br />31.9 <br />31.9 <br />1 Pit East <br />23.4 <br />23.4 <br />J Pit Middle <br />56.5 <br />S6.5 <br />J Pit East <br />14.2 <br />14.2 <br />Total Reclaimed <br />31.9 <br />94.1 <br />126.0 <br />Net Open Acres <br />61.1 <br />174.8 <br />80.7 <br />The table above anticipates having 80.7 acres of open lands at the end of the permit term that <br />ultimately needs to be reclaimed. It is anticipated that there will be 126 acres of reclaimed land <br />that will not be Phase Bond Released as yet. Trapper submitted the PR10 application prior to <br />the final approval of the PR9 application, in which corrections were made regarding this <br />assumption that, lands assumed to be graded topsoiled and revegetated, prior to the Worst Case <br />Bond Year would require additional work, (see CIRCES Task RNYBR). Utilizing this premise, <br />the Bond Estimate for PR10 has been revise to include these 126.0 acres in I and Jpits. A <br />separate tasklline item was inserted into the Direct Cost portion of the PR10 Appendix A <br />Summary Table (Table A-1), which includes the additional costs of topsoil placement and <br />revegetation for the entire 206.7 acres, 80.7 acres to be fully reclaimed and 126.0 acres of <br />RNYBR. The same unit costs and methodology used for CIRCES PR9 bond RNYBR <br />adjustment was also employed in the PR10 cost adjustment. The revise PR10 bond estimate is <br />included. <br />DRMS October 2020 <br />Trapper's response is adequate with the exception of: <br />3a. Please submit Table 1.4-1 Open Acreage Table as part of this permitting action. <br />Trapper Response: <br />Upon further discussion with Ms. Reilley updates to table 1.4-1 will not be necessary. The requested <br />information has been included on the "Appendix A Bond Addendum Summary," with the additional <br />bonding amount added for PR-10 and included in this response. <br />
The URL can be used to link to this page
Your browser does not support the video tag.